Package Substation


- MV switchgear, Transformer, LV switchgear in Single enclosure
- Better Aesthetics of the system
- Less maintenance, reduction in overall commissioning time
- Reduction in overall civil cost
- Savings in land cost because of compactness
- Maximum safety to operators & general public
- Type tested & Internal Arc tested as per IEC- 62271-202 Minimized cable laying work since cable connection between MV switchgear & Transformer, between Transformer & LV switchgear is done at factory
